§ 4.08.020. Service charges and water commodity rates.  


Latest version.
  • A.

    Meter service charge. After July 1, 2019, the District may discontinue bimonthly billing and bill customers on a monthly basis. The following tables show the service charges that will be imposed both on a monthly basis and on a bimonthly basis, with the service charge imposed on a monthly basis equaling half of the service charge imposed on a bimonthly basis. The District may pro-rate the service charge on a per-day basis if necessary during the transition period from bimonthly billing to monthly billing. The rates for the bimonthly meter service charge, according to meter size, are as follows:

    Meter Size Effective
    7/1/2015 Bimonthly
    Effective
    7/1/2016 Bimonthly
    Effective
    7/1/2017 Bimonthly
    Effective
    7/1/2018 Bimonthly
    5/8 " × ¾" $30.35 $35.64 $41.75 $50.00
    ¾" 30.35 35.64 41.75 50.00
    1" 50.58 59.39 69.58 83.33
    1½" 101.16 118.79 139.16 166.67
    2" 161.86 190.06 222.65 266.67
    3" 303.48 356.36 417.47 500.00
    4" 505.80 593.96 695.79 833.33
    6" 1,011.60 1,187.87 1,391.57 1,666.67
    8" 1,618.57 1,900.59 2,226.51 2,666.67
    10" 2,427.85 2,850.88 3,339.77 4,000.00
    12" 3,642.00 4,276.80 5,010.00 6,000.00

     

    The rates for the monthly meter service charge, according to meter size, are as follows:

    Meter Size Effective 7/1/2018 Monthly
    ⅝"×¾" $25.00
    ¾" 25.00
    1" 41.66
    1½" 83.33
    2" 133.33
    3" 250.00
    4" 416.66
    6" 833.33
    8" 1,333.33
    10" 2,000.00
    12" 3,000.00

     

    B.

    Water commodity charge—Non-drought. The rates for the non-drought water commodity charge and the amount of water allocated to each tier, based on the hydraulic capacity of the customer's meter, are as follows:

    Non-Drought Commodity Rate per hcf Effective
    7/1/2015
    Effective
    7/1/2016
    Effective
    7/1/2017
    Effective
    7/1/2018
    Tier 1 $1.59 $1.60 $1.61 $1.62
    Tier 2 2.11 2.13 2.14 2.16
    Tier 3 2.62 2.66 2.68 2.71
    Tier 4 2.99 3.03 3.05 3.07

     

    Bimonthly tier allocation, according to the meter size, is as follows:

    Allocation in Units (hcf)
    Meter Size Hydraulic Capacity Tier 1
    No. of Units
    Bimonthly
    Tier 2
    No. of Units
    Bimonthly
    Tier 3
    No. of Units
    Bimonthly
    Tier 4
    No. of Units
    Bimonthly
    ¾-inch 1.0 0—10 11—40 41—100 >100
    1-inch 1.67 0—17 18—67 68—167 >167
    1.5-inch 3.33 0—33 34—133 134—333 >333
    2-inch 5.33 0—53 54—213 214—533 >533
    3-inch 10.00 0—100 101—400 401—1,000 >1,000
    4-inch 16.67 0—167 168—667 668—1,667 >1,667
    6-inch 33.33 0—333 334—1,333 1,334—3,333 >3,333
    8-inch 53.33 0—533 534—2,133 2,134—5,333 >5,333
    10-inch 80.00 0—800 801—3,200 3,201—8,000 >8,000
    12-inch 120.00 0—1,200 1,201—4,800 4,801—12,000 >12,000

     

    Monthly tier allocation, according to the meter size, is as follows:

    Allocation in Units (hcf)
    Meter Size Hydraulic Capacity Tier 1
    No. of Units
    Monthly
    Tier 2
    No. of Units
    Monthly
    Tier 3
    No. of Units
    Monthly
    Tier 4
    No. of Units
    Monthly
    ¾-inch 1.0 0—5 6—20 21—50 >50
    1-inch 1.67 0—9 10—34 35—84 >84
    1.5-inch 3.33 0—17 18—67 68—167 >167
    2-inch 5.33 0—27 28—107 108—267 >267
    3-inch 10.00 0—50 51—200 201—500 >500
    4-inch 16.67 0—84 85—334 335—834 >834
    6-inch 33.33 0—167 168—667 668—1,667 >1,667
    8-inch 53.33 0—267 268—1,067 1,068—2,667 >2,667
    10-inch 80.00 0—400 401—1,600 1,601—4,000 >4,000
    12-inch 120.00 0—600 601—2,400 2,401—6,000 >6,000

     

    C.

    Water commodity drought rates—Stages 2—7. The rates for the water commodity charge to be implemented during declared drought stages ("Water Commodity Drought Rates") are listed below. The water commodity drought rates will be enacted by a vote of the board of directors in concurrence with the declaration of drought stages as set forth in Chapter 4.24 of the District Code. The amount of water allocated to each tier is based on the hydraulic capacity of the customer's meter as indicated in section B.

    (10% Conservation)
    Drought Stage 2 Commodity Rate per hcf Effective
    7/1/2015
    Effective
    7/1/2016
    Effective
    7/1/2017
    Effective
    7/1/2018
    Tier 1 $1.69 $1.70 $1.71 $1.72
    Tier 2 2.15 2.17 2.18 2.20
    Tier 3 2.77 2.81 2.83 2.86
    Tier 4 3.56 3.65 3.67 3.70

     

    (15% Conservation)
    Drought Stage 3 Commodity Rate per hcf Effective
    7/1/2015
    Effective
    7/1/2016
    Effective
    7/1/2017
    Effective
    7/1/2018
    Tier 1 $1.79 $1.80 $1.81 $1.82
    Tier 2 2.21 2.24 2.25 2.26
    Tier 3 2.83 2.87 2.88 2.91
    Tier 4 3.80 3.83 3.86 3.88

     

    (20% Conservation)
    Drought Stage 4 Commodity Rate per hcf Effective
    7/1/2015
    Effective
    7/1/2016
    Effective
    7/1/2017
    Effective
    7/1/2018
    Tier 1 $1.90 $1.92 $1.93 $1.94
    Tier 2 2.29 2.31 2.32 2.33
    Tier 3 2.89 2.93 2.94 2.96
    Tier 4 4.05 4.07 4.10 4.12

     

    (25% Conservation)
    Drought Stage 5 Commodity Rate per hcf Effective
    7/1/2015
    Effective
    7/1/2016
    Effective
    7/1/2017
    Effective
    7/1/2018
    Tier 1 $2.03 $2.05 $2.06 $2.07
    Tier 2 2.36 2.39 2.39 2.40
    Tier 3 2.95 2.99 3.00 3.01
    Tier 4 4.37 4.40 4.42 4.44

     

    (35% Conservation)
    Drought Stage 6 Commodity Rate per hcf Effective
    7/1/2015
    Effective
    7/1/2016
    Effective
    7/1/2017
    Effective
    7/1/2018
    Tier 1 $2.34 $2.35 $2.37 $2.38
    Tier 2 2.55 2.56 2.56 2.58
    Tier 3 3.09 3.13 3.11 3.11
    Tier 4 5.68 5.69 5.75 5.77

     

    (50% Conservation)
    Drought Stage 7 Commodity Rate per hcf Effective
    7/1/2015
    Effective
    7/1/2016
    Effective
    7/1/2017
    Effective
    7/1/2018
    Tier 1 $2.86 $2.88 $2.88 $2.90
    Tier 2 3.16 3.18 3.18 3.19

     

    D.

    Pass-through adjustments. The board hereby authorizes, for a five-year period, the imposition of pass-through adjustments.

    Pass-through adjustments may be imposed in the fiscal year commencing July 1, 2015, and each fiscal year thereafter, through and including the fiscal year commencing July 1, 2019. A pass-through adjustment will only impact the rates of the commodity charge set forth in this Ordinance. Provided, however, that (1) any increase in the rates for wholesale water and any other charged that MWD or IEUA imposes on the district that are greater than those projected in the Water Rate Study ("each a pass-through adjustment"); (2) any increase in the rates of the commodity charge as a result of any pass-through adjustment shall not exceed $1.00 per HCF in any one year; and (3) in no event shall such rates be increased as a result of a pass-through adjustment by more than the cost of providing water service.

    Prior to implementing any such future rate increase resulting from a pass-through adjustment, the District General Manager is hereby directed and shall provide written notice of any such rate increase to District customers not less than 30 days prior to the effective date of the rate increase. Any such notice may be provided in the regular billing statements of the District water customers. In the event that an increase from a pass-through adjustment is implemented in accordance with this Ordinance, the District General Manager, or his authorized designee, is hereby directed and shall revise the schedule of rates and charges set forth in Part D of Chapter 4.08.020 of Title 4 of the District Code to reflect the rate then in effect as a result of any increase resulting from a pass-through adjustment.

    Pass-through Adjustment Effective 7/1/2015 Effective 7/1/2016 Effective 7/1/2017 Effective 7/1/2018 Effective 7/1/2019
    MWD Surcharge Rate per hcf $0.00 $0.11 $0.10 $0.14 TBD

     

    E.

    Temporary water service rate. The temporary water service rate (construction water) is as follows:

    Temporary Water Service Rate per hcf Effective
    7/1/2015
    Effective
    7/1/2016
    Effective
    7/1/2017
    Effective
    7/1/2018
    Non-Drought $4.58 $4.63 $4.65 $4.70
    Drought Stage 2 4.75 4.80 4.81 4.84
    Drought Stage 3 4.85 4.90 4.91 4.94
    Drought Stage 4 4.97 5.02 5.03 5.05
    Drought Stage 5 5.10 5.15 5.15 5.17
    Drought Stage 6 5.34 5.38 5.37 5.39
    Drought Stage 7 (if available) 6.10 6.13 6.14 6.15

     

(Ord. 2008-4-1 § 2, 2008; Ord. No. 2009-8-1, exh. A, 8-11-2009; Ord. No. 2010-4-3, exh. A, 4-27-2010; Ord. No. 30-G, exh. A, 5-25-2010; Ord. No. 30-H, exh. A, 8-27-2013; Ord. No. 2015-6-1, § 3, 6-9-2015 ; Ord. No. 2019-4-4 , 4-23-2019)